After a process lasting more than three years Penzance Cricket Club have a triple bay practice facility consisting of two "Premier" and one "Test Match" batting ends, bowling ends and VG14 surrounds. The overall area measures 33.00 x 13.00m and is surrounded by a 3.00m high 8-6-8 welded mesh fence. Funding became available from Sport England and levelling work on the site began in February. Unfortunately the heavy rain immediately flooded the area and works couldnt continue until Mid April.
Once the final sub-base levels were established the sockets were installed for the frame followed by the stone for the surrounds and the bases for the batting and bowling ends. Starting from the rear of the batting ends, the shockpads and surfaces were fitted as the base works for the bowling ends and run ups continued. As the end neared the perimeter fencing was installed with a double gated access point allowing access for maintenace equipment and ambulances.
With all the surfacing installed the frame and netting was erected and a netting and mesh sight screen and ball stop erected behind the bowlers run ups. This will stop balls going into the adjacent car park and protect the fencing from balls that are struck back out of the net lanes. The frame features a unique feature to prevent heavy rain causing damage to the aggregate bases of the batting ends.
Cricket Case Studies | 04/04/2016
Ready to start
your Verde Project?
Shop Sports SurfacesShop Home and LeisureShop Artificial GrassShop CricketShop AccessoriesShop Special OffersShop Graves