CALL US NOW FOR BLACK FRIDAY SPECIALS 01254 831666
Cricket Case Studies | 06/06/2015
In 2003 a single lane "Test Match" system with a 14.40m long frame was installed at the club. The batting and bowling ends were resurfaced in 2014, after eleven season use and plans were formulated to increase the size of the facility to three lanes by adding two new lanes one each side of the original facility.
Funding became available to the club over the 2014/15 winter and after investigating the current market the club returned to us to provide two additional "Test Match" systems.
First thing to do was to remove the old surrounds and take down the frame and netting.
In order to comply with current ECB recommendations the frame line had to be moved back from its current location such that there is now 1.50m between the netting and the batting strip to all three lanes.
New bases were installed for the additional batting and bowling ends and the surrounds graded to match. Once completed the surfaces were laid and the extended frame and netting were erected.
With the background behind the batsmen being dark a white screen has been installed to help bowlers see balls struck back towards them.
Cricket Case Studies | 06/06/2015
Ready to start
your Verde Project?
Shop Sports SurfacesShop Home and LeisureShop Artificial GrassShop CricketShop AccessoriesShop Special OffersShop Graves